Intensive Cost Estimation (ICE).

$50.00 per 30 days

SUBSCRIPTION FOR 4 weeks, 2 days
Category:

Description

About this course:
This course provides an overview of the basic procedures for estimating general construction costs. Topics include the preparation of quantity surveys (take-offs) and the development of material, labor, and equipment costs, including pricing of contractor and subcontractor work from actual working drawings and specifications. The tools used in this course require a PC/Laptop with a Windows Operating System, and MAY NOT BE compatible with other operating systems.

Reviews

There are no reviews yet.

Be the first to review “Intensive Cost Estimation (ICE).”

Your email address will not be published.

Hanad Learning Center © 2020 Hanad Learning. All rights reserved.